0050.02.0817
"Nablus Electricity Network", a Letter from Bassam ash-Shakʿa to Tulkarm Mayor, 18 February 1982

Written in Arabic, this document shows a letter from Bassam ash-Shakʿa, Mayor of Nablus, to the Mayor of Tulkarm on 18 February 1982 about military orders no. 427 and 602 regarding impeding the extension of the electricity network to villages. In the letter, ash-Shakʿa also states that the military governor was loaded for bear to stop the instalment of power lines to a quarry and in addition to detaining eighteen engineers and workers in the said project. The Israeli governor also removed the Rujeib overhead power line, linked Sebastia by force to the Israeli electricity network, and called up the contractor and workers at the overhead power line project in an-Naqura. 

Date created

February 18 1982

TYPE

Text

LOCATION

More details

Format

Letters

Source of Description

Ozrail, Samar. "The Bassam Shak'a Collection". Archival Inventory. August 2019. The Palestinian Museum Digital Archive. Shak'a, Bassam. Al-Fassed, Enaya. "The Bassam Shak'a Collection". Interview with PMDA Researcher Wijdan Samara. 2015. The Palestinian Museum Digital Archive.

Help us refine the information, suggest a change in the content of this item

Suggest a Change
0050.02.0817
"Nablus Electricity Network", a Letter from Bassam ash-Shakʿa to Tulkarm Mayor, 18 February 1982

This photo may contain violent content